PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing metal framing at the 3rd floor Facing North-East.jpg VAV Boxes 1.jpg VAV Boxes 2`.jpg VAV Boxes 3.jpg 045 (800x600).jpg 3rd floor sprinkler main raiser Facing North-East.jpg Column Line E-1 3rd Floor.jpg Erecting the stone panels at the 4th floor West Elevation.jpg Installing 3rd floor sprinkler raiser Facing West.jpg
Previous pageNext page 045 (800x600)
045 (800x600)